Projeler - Çatalağzı Thermal Power Plant (2×150 MW)

Projeler - Çatalağzı Thermal Power Plant (2×150 MW)

projects Description
Project :

Çatalağzı Thermal Power Plant Long Distance Converyor Line Çatalağzı,Zonguldak – Turkey

Client : TEAŞ – Turkey Electric Production Transmission Inc.
Contract Date : 07.05.1987
Completion Date : The project has been completed on 30.06.1994.
Duration : 85 Months
Status : Main Contractor
Percentage Of Participation : 100 %
General Description Of The Project : The Project covers the civil works, manufacturing works and erection works of 3900 meters of coal conveying line between Çatalağzı B2 Thermal Power Plant and Karadon Coal Stockyard.
Detailed Description Of The Project :
  • Excavation : 1,396 m3 (underwater) 218,644 m3 (wet clay)
  • Filling and soil improvement : 201.801 m3
  • Concrete : 16.577 m3
  • Steel Construction Manufacturing and Erection Works : 3290 tons
Liquida Ted Damages : None