projects Description
Project : Yedigöze Sani Bey Dam & Hycroellectric Power Plant Project Hydromechanical Equipment Manufacturing And Erection Works, Adana – Turkey
Client : Yedigöze Elektrik Üretim A.Ş.
Contract Date : 09.01.2009
Duration : 11 Months
Status : Main Contractor
Percentage Of Participation : 100 %
General Description Of The Project : The Project area is located between the Akören district and initial point of Menteş reservoir, which is 34 km southeast from İmaoğlu district of Adana on the Seyhan River in Mediterranean region.

The dam is a rock fill dam, that upstream face is covered with reinforced concrete, thalweg elevation is 105 m and crest elevation is 131m. The hydroelectric plant is composed of two unit, which has 369,84 m3/s maximum project inflow, 95,50 m gross head and 317 MW installed capacity.

Project covers the manufacturing, erection, testing and commissioning works of mechanical and hydromechanical equipment, and also supply and provision of the spare parts described in Technical specification.

Design and engineering works of water intake structure stop logs, emergency gates, suction side stop logs, spillway stop logs and radial gates are within the scope of the project. The diameter of the penstock which shall be manufactured and erected on site is 6300 mm.

Detailed Description Of The Project : Mechanical equipment designed : 2000 tons
Mechanical equipment manufactured and erected : 5000 tons