Project | : |
Tepekışla Dam & Hydroelectric Power Plant Project Hydromechanical EquipmentManufacturing And Erection Works |
Client | : | Ark Enerji Üretimi Sanayi Ve Ticaret A.Ş. |
Contract Date | : | 06.01.2014 |
Duration | : | 11 Months |
Status | : | Sub-Contractor |
Percentage Of Participation | : | 100 % |
General Description Of The Project | : | 850 MWe Combined Cycle Gas Power Plant which is constructed in Kocaeli-Gebze VI. IMES Industrial Zone of TURKEY. |
Detailed Description Of The Project | : | The Project area is located between Erbaa and Niksar, which is app. 80 km north of the city, Tokat and app. 200 km south of the city Samsun on the Kelkit River.The hydroelectric plant is composed of two big and one smaller units, with the total capacity of 68.5 MW.
Project covers the manufacturing, erection, testing and commissioning works of mechanical and hydromechanical equipment, and also supply and provision of the spare parts described in technical specification. Design and engineering works of water intake structure stop logs, emergency gates, suction side stop logs, spillway stop logs and radial gates are within the scope of the project. The diameter of the penstock which shall be manufactured at our workshop in Ankara and transported to the project site is 5000 mm. The transportation distance between Ankara and project site is app. 500 km. |
Detailed Description Of The Project | : | Mechanical equipment designed: 782 tons
Mechanical equipment to be manufactured and erected: 1.873 tons |