Projeler - Isdemir Continuous Billet Casting Plant (2.000.000 T/Y)

Projeler - Isdemir Continuous Billet Casting Plant (2.000.000 T/Y)

projects Description
Project : 2.000.000 Tons/Year Capacity 2×6 Strand Continious Billet Casting Plant
Client : İSDEMİR ‚ İskenderun Iron and Steel Works Co. İskenderun – Turkey
Contract Date : 31.07.2002
Duration : 13 Months
Completion Date : The project was completed on 22.04.2004.
Status : Main Contractor (Consortium)
Percentage Of Participation : 30,32 %
General Description Of The Project :

The project has been performed on a turnkey basis by the consortium of EKON and CONCAST AG (Switzerland). EKON’s scope was detail engineering of localscope, all civil works, structural steel manufacturing and erection, supply anderection of mechanical equipment, piping (water, hydraulic, gases), design andinstallation of the water treatment plant and electrical and automation systemsdesign and erection works.

Detailed Description Of The Project : Civil Works:

  • Excavation : 4.800 m3
  • Filling : 14.700 m3
  • Reinforced Concrete : 14.000 m3
  • Formwork : 21.000 m3
  • Reinforcement (Rebars) : 850 tons
  • Steel Structure : 1400 tons

Mechanical Works:

  • Mechanical Equipment : 2200 tons
  • Hydraulic Piping : 29 tons
  • Piping (Carbon S.) : 233 tons
  • Piping (Stainless S.) : 15 tons
Liquida Damages : None