Projeler - Erdemir Air Separation Plant No:6

Projeler - Erdemir Air Separation Plant No:6

projects Description
Project : Erdemir Air Separation Plant No:6, Kdz. Ereğli – Turkey
Client : Ereğli Iron And Steel Works Company
Contract Date : 13.04.2004
Completion Date : The Date of Commercial Operation Certificate for Air Separation Plant No.6 is on December 11, 2006 and Final Acceptance Certificate is on November 30, 2007.
Duration : 20 Months
Status : Main Local Sub Supplier
Percentage Of Participation : 100 %
General Description Of The Project : Engineering, manufacturing, supply and erection works.
Detailed Description Of The Project : Engineering:The detail design of Steel Structures (pipe racks, pipe supports, ladders, platforms, etc.), Spray Cooler Vessel (incl. accessories), Evaporative Cooler Vessel (incl. Accessories), Cooling Tower (incl. accessories), Cranes (for machine shop and cold box), Connection Box for Pumps.

Manufacturing : All the designed equipments and steel structures.

Supply : The Pipes, Fittings and 250 kVA Diesel Generator.

Erection: Cold Box.