Project |
: |
5800 Tons / Day Clinker Capacity Djebel Ressas Cement Plant Tunisia
|
Client |
: |
Carthage Cement |
Consultant |
: |
PEG S.A. (Switzerland) |
Contract Date |
: |
24.02.2010 (Effectuation Date: 24.05.2010) |
Duration |
: |
26 Months + 21 Days (First Clinker) + 13,5 Months (time extension) |
Status |
: |
EPC Contractor |
Percentage Of Participation |
: |
The project shall be realized by EKON–PROKON–FLSmidth Consortium |
General Description Of The Project |
: |
Within the content of the project:
- EKON shall perform the engineering and execution of civil works, structuralsteel, mechanical, electrical erection, automation and commissioning worksof the plant,
- PROKON shall provide some mechanical equipments and shall carry out theengineering and supply of steel structure of the plant,
- FLS shall carry out the equipment and engineering supply of the plant.
|
Detailed Description Of The Project |
: |
The plant is located approx. 25 km south of Capital of Tunisia (Tunis) near an existing quarry and will have a total clinker production capacity of 5.800 tons/day. Scope of works covers manufacturing and erection of 8.000tons steel structures and 12,500tons of steel equipment, in total 20,500tons. The “Greenfield” project consists of the following departments:
- Raw material crushing, conveying and storage
- Coal intake, storage, transport
- Additive crushing, intake, storage, transport
- Raw mill
- Homogenization Silo
- Preheater, Kiln, Clinker Cooler
- By-pass system
- Coal Mill
- Clinker transport and storage
- Cement Mill (1 and 2)
- Cement Silos (1, 2 and 3)
- Packing Plant (4 units)
- Bulk dispatch to trucks
- Bag dispatch to trucks (4 units)
- Palletizing plant
- Alternative liquid fuel storage
- Natural gas distribution
- Compressor rooms
- Water treatment and distribution
- Potable water unit
- Weighbridges
- Electrical substations
- Central control room and laboratory
- Service Buildings (Workshop, Changing room, open/closed storage, canteen, administration building, guard house)
|