	<title>Iron &amp; Steel Industry &#8211; EKON Endüstri İnşaat ve Ticaret A.Ş</title>
	<atom:link href="https://ekonas.com.tr/en/projects_cat/iron-steel-industry/feed/" rel="self" type="application/rss+xml" />
	<link>https://ekonas.com.tr</link>
	<description></description>
	<lastBuildDate>Wed, 08 Jun 2022 19:55:32 +0000</lastBuildDate>
	<language>en-US</language>
	<sy:updatePeriod>
	hourly	</sy:updatePeriod>
	<sy:updateFrequency>
	1	</sy:updateFrequency>
	<generator>https://wordpress.org/?v=6.8.1</generator>
	<item>
		<title>İsdemir No.1 Blast Furnace Project (2.800.000 Ton/year)</title>
		<link>https://ekonas.com.tr/en/projects/isdemir-no-1-blast-furnace-project-2-800-000-ton-year/</link>
					<comments>https://ekonas.com.tr/en/projects/isdemir-no-1-blast-furnace-project-2-800-000-ton-year/#respond</comments>
		
		<dc:creator><![CDATA[ekonas_yonetim]]></dc:creator>
		<pubDate>Wed, 08 Jun 2022 19:53:02 +0000</pubDate>
				<guid isPermaLink="false">https://ekonas.com.tr/?post_type=portfolio&#038;p=2027</guid>

					<description><![CDATA[<p>Being one of the ISDEMIR's modernization investments, the project included all modification, erection, dismantling and relocation works of existing Blast Furnace No.3 and auxiliary plants. The modernization increased blast furnace production capacity from 1.300.000 tons/year to 1.800.000 tons/year.</p>
]]></description>
										<content:encoded><![CDATA[<ul>
<li>Project covers civil works, procurement, steel structure supply and erection, equipment supply and erection, electrical &amp; automation works of New Isdemir No.1 Blast Furnace, Slag Granulation Systems, Hot Blast and Gas Cleaning Systems. Once completed, the New Blast Furnace will be the largest in Turkey with a capacity of 2,8 million ton/year.</li>
</ul>
<p>&nbsp;</p>
<ul>
<li>İSDEMİR is one of the largest integrated steel producers in Turkey. With this New Blast Furnace investment, both the capacity and the efficiency of the existing plant will increase substantially.</li>
</ul>
]]></content:encoded>
					
					<wfw:commentRss>https://ekonas.com.tr/en/projects/isdemir-no-1-blast-furnace-project-2-800-000-ton-year/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		
			</item>
		<item>
		<title>Kardemir Gas Cooling and Cleaning Plant</title>
		<link>https://ekonas.com.tr/en/projects/kardemir-gas-cooling-and-cleaning-plant/</link>
					<comments>https://ekonas.com.tr/en/projects/kardemir-gas-cooling-and-cleaning-plant/#respond</comments>
		
		<dc:creator><![CDATA[Ekonas Site Yönetimi]]></dc:creator>
		<pubDate>Sun, 05 Jun 2022 21:11:24 +0000</pubDate>
				<guid isPermaLink="false">https://ekonas.com.tr/?post_type=portfolio&#038;p=1769</guid>

					<description><![CDATA[<p>The project had two stages, the first stage covered the Engineering, Procurement and Supply of Equipment,and the second stage covered the Civil Works, Erection Works and Commissioning of the Converter Gases Cooling and Cleaning Plant for KARDEMİR Karabük Iron and Steel Factory Inc.</p>]]></description>
										<content:encoded><![CDATA[<table style="width: 100%;">
<tbody>
<tr>
<td style="width: 30%;"><strong>Project</strong></td>
<td style="width: 2%;"><strong>:</strong></td>
<td>Converter Gases Cooling and Cleaning Plant for KARDEMIR Karabük, Zonguldak &#8211; Turkey</td>
</tr>
<tr>
<td><strong>Client</strong></td>
<td><strong>:</strong></td>
<td>KARDEMİR Karabük Iron and Steel Factory Inc.</td>
</tr>
<tr>
<td><strong>Contract Date</strong></td>
<td><strong>:</strong></td>
<td>01.12.1997</td>
</tr>
<tr>
<td><strong>Completion Date</strong></td>
<td><strong>:</strong></td>
<td>The project has been completed on 24.05.1999.</td>
</tr>
<tr>
<td><strong>Duration</strong></td>
<td><strong>:</strong></td>
<td>18 Months</td>
</tr>
<tr>
<td><strong>Status</strong></td>
<td><strong>:</strong></td>
<td>Main Contractor</td>
</tr>
<tr>
<td><strong>Percentage Of Participation</strong></td>
<td><strong>:</strong></td>
<td>100 %</td>
</tr>
<tr>
<td><strong>General Description Of The Project</strong></td>
<td><strong>:</strong></td>
<td>
<p class="normalYazi">The project had two stages:</p>
<ul>
<li class="normalYazi">First stage covered the Engineering, Procurement and Supply of Equipment.</li>
<li class="normalYazi">The second stage covered the Civil Works, Erection Works and Commissioning ofthe Converter Gases Cooling and Cleaning Plant for KARDEMİR Karabük Iron andSteel Factory Inc.</li>
</ul>
</td>
</tr>
<tr>
<td><strong>Detailed Description Of The Project</strong></td>
<td><strong>:</strong></td>
<td>Civil Works:</p>
<ul>
<li>Excavation : 12,000 m3</li>
<li>Concrete : 3,900 m3</li>
<li>Formwork : 9,172 m2</li>
<li>Scaffolding : 15,000 m3</li>
<li>Reinforcement : 208 tons</li>
</ul>
<p>Mechanical Works:</p>
<ul>
<li>Design, Manufacturing, Supply and Erection of Technological Equipment : 600 tons</li>
<li>Design and Supply of Piping Works : 200 tons</li>
<li>Design and Erection Works of Automation System (PLC, MCC, MMI) : 450 nos.</li>
<li>Cable Supply &amp; Erection : 77,000 m</li>
<li>Conduit Supply and Erection : 3,500 m</li>
<li>Lightening Works</li>
</ul>
</td>
</tr>
</tbody>
</table>
]]></content:encoded>
					
					<wfw:commentRss>https://ekonas.com.tr/en/projects/kardemir-gas-cooling-and-cleaning-plant/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		
			</item>
		<item>
		<title>İsdemir Hot Rolling Mill</title>
		<link>https://ekonas.com.tr/en/projects/isdemir-hot-rolling-mill/</link>
					<comments>https://ekonas.com.tr/en/projects/isdemir-hot-rolling-mill/#respond</comments>
		
		<dc:creator><![CDATA[Ekonas Site Yönetimi]]></dc:creator>
		<pubDate>Sun, 05 Jun 2022 21:11:08 +0000</pubDate>
				<guid isPermaLink="false">https://ekonas.com.tr/?post_type=portfolio&#038;p=1767</guid>

					<description><![CDATA[<p>The project covers the construction of a new building and strengthening of the existing building for the new hot rolling mill line.</p>]]></description>
										<content:encoded><![CDATA[<table style="width: 100%;">
<tbody>
<tr>
<td style="width: 30%;"><strong>Project</strong></td>
<td style="width: 2%;"><strong>:</strong></td>
<td>Hot Rolling Mill Project,Steel Construction Manufacturing &amp;Steel Construction Assembly Works, İskenderun &#8211; Turkey</td>
</tr>
<tr>
<td><strong>Client</strong></td>
<td><strong>:</strong></td>
<td>İSDEMİR ‚Äì İskenderun Iron &amp; Steel Co.İskenderun &#8211; Turkey</td>
</tr>
<tr>
<td><strong>Consultant</strong></td>
<td><strong>:</strong></td>
<td>ERENCO (Erdemir Engineering Management &amp;Consulting Services Inc.)</td>
</tr>
<tr>
<td><strong>Contract Date</strong></td>
<td><strong>:</strong></td>
<td>03.10.2006</td>
</tr>
<tr>
<td><strong>Duration</strong></td>
<td><strong>:</strong></td>
<td>17 Months</td>
</tr>
<tr>
<td><strong>Status</strong></td>
<td><strong>:</strong></td>
<td>Main Contractor</td>
</tr>
<tr>
<td><strong>Percentage Of Participation</strong></td>
<td><strong>:</strong></td>
<td>
<p class="normalYazi" style="margin-left: 1.0cm; text-indent: -1.0cm; tab-stops: 1.0cm 155.95pt 163.0pt;">100 %</p>
<p class="normalYazi" style="margin-left: 1.0cm; text-indent: -1.0cm; tab-stops: 1.0cm 155.95pt 163.0pt;">
</td>
</tr>
<tr>
<td><strong>General Description Of The Project</strong></td>
<td><strong>:</strong></td>
<td>The project covers the construction of a new building and strengthening of the existing building for the new hot rolling mill line.</td>
</tr>
<tr>
<td><strong>Detailed Description Of The Project</strong></td>
<td><strong>:</strong></td>
<td>Manufacturing and erection of 4500 tons of steel construction for 20,000 m2 new building and strengthening of 65,000 m2 existing building.Manufacturing and erection of 2500 tons crane girders and 26,000 cladding works.</td>
</tr>
<tr>
<td><strong>Main Subcontractor</strong></td>
<td><strong>:</strong></td>
<td>MAK-IN Engineering and Construction Co.</td>
</tr>
</tbody>
</table>
]]></content:encoded>
					
					<wfw:commentRss>https://ekonas.com.tr/en/projects/isdemir-hot-rolling-mill/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		
			</item>
		<item>
		<title>Isdemir Ore Dressing Facility</title>
		<link>https://ekonas.com.tr/en/projects/isdemir-ore-dressing-facility/</link>
					<comments>https://ekonas.com.tr/en/projects/isdemir-ore-dressing-facility/#respond</comments>
		
		<dc:creator><![CDATA[Ekonas Site Yönetimi]]></dc:creator>
		<pubDate>Sun, 05 Jun 2022 21:10:54 +0000</pubDate>
				<guid isPermaLink="false">https://ekonas.com.tr/?post_type=portfolio&#038;p=1765</guid>

					<description><![CDATA[<p>Scope of the project includes modernization, engineering, production, construction and erection of ore preparation system, blending and manipulation of raw material.</p>]]></description>
										<content:encoded><![CDATA[<table style="width: 100%;">
<tbody>
<tr>
<td style="width: 30%;"><strong>Project</strong></td>
<td style="width: 2%;"><strong>:</strong></td>
<td>İSDEMİR Modernization Investment Programme Ore Dressing Facility in İskenderun</td>
</tr>
<tr>
<td><strong>Client</strong></td>
<td><strong>:</strong></td>
<td>İSDEMİR ‚ İskenderun Iron &amp; Steel Co.</td>
</tr>
<tr>
<td><strong>Consultant</strong></td>
<td><strong>:</strong></td>
<td>ERENCO ‚ Erdemir Engineering Management &amp; Consulting Services Inc.</td>
</tr>
<tr>
<td><strong>Contract Date</strong><br />
<strong>Commencement Date</strong></td>
<td><strong>:</strong></p>
<p><strong>:</strong></td>
<td>05.03.2007</p>
<p>08.03.2007</td>
</tr>
<tr>
<td><strong>Duration</strong></td>
<td><strong>:</strong></td>
<td>450 Day</td>
</tr>
<tr>
<td><strong>Status</strong></td>
<td><strong>:</strong></td>
<td>Main Contractor</td>
</tr>
<tr>
<td><strong>Percentage Of Participation</strong></td>
<td><strong>:</strong></td>
<td>
<p class="normalYazi" style="margin-left: 1.0cm; text-indent: -1.0cm; tab-stops: 1.0cm 155.95pt 163.0pt;">100 %</p>
<p class="normalYazi" style="margin-left: 1.0cm; text-indent: -1.0cm; tab-stops: 1.0cm 155.95pt 163.0pt;">
</td>
</tr>
<tr>
<td><strong>General Description Of The Project</strong></td>
<td><strong>:</strong></td>
<td>Scope of the project includes modernization, engineering, production, construction and erection of ore preparation system, blending and manipulation of raw material.</td>
</tr>
<tr>
<td><strong>Detailed Description Of The Project</strong></td>
<td><strong>:</strong></td>
<td>Sections of Factory:</p>
<ul>
<li>Conveyor : 500 m</li>
<li>Stacker : Erection</li>
<li>Reclaimer : Erection</li>
</ul>
<p>Completed works:</p>
<ul>
<li>Excavation : 000 m3</li>
<li>Piling : 000 m</li>
<li>Concrete : 000 m3</li>
<li>Steel Structure : 800 tons</li>
<li>Electrical System ( Complete )</li>
<li>Automation System</li>
<li>Instrumentation</li>
</ul>
</td>
</tr>
<tr>
<td><strong>Main Subcontractor</strong></td>
<td><strong>:</strong></td>
<td>SIEMENS</td>
</tr>
</tbody>
</table>
]]></content:encoded>
					
					<wfw:commentRss>https://ekonas.com.tr/en/projects/isdemir-ore-dressing-facility/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		
			</item>
		<item>
		<title>Isdemir Continuous Billet Casting Plant (2.000.000 T/Y)</title>
		<link>https://ekonas.com.tr/en/projects/isdemir-continuous-billet-casting-plant-2-000-000-t-y/</link>
					<comments>https://ekonas.com.tr/en/projects/isdemir-continuous-billet-casting-plant-2-000-000-t-y/#respond</comments>
		
		<dc:creator><![CDATA[Ekonas Site Yönetimi]]></dc:creator>
		<pubDate>Sun, 05 Jun 2022 21:10:40 +0000</pubDate>
				<guid isPermaLink="false">https://ekonas.com.tr/?post_type=portfolio&#038;p=1763</guid>

					<description><![CDATA[<p>The project has been performed on a turnkey basis by the consortium of EKON and CONCAST AG (Switzerland). EKON's scope was detail engineering of local scope, all civil works, structural steel manufacturing and erection, supply and erection of mechanical equipment, piping (water, hydraulic, gases), design and installation of the water treatment plant and electrical and automation systems design and erection works.</p>]]></description>
										<content:encoded><![CDATA[<table style="width: 100%;">
<tbody>
<tr>
<td style="width: 30%;"><strong>Project</strong></td>
<td style="width: 2%;"><strong>:</strong></td>
<td>2.000.000 Tons/Year Capacity 2&#215;6 Strand Continious Billet Casting Plant</td>
</tr>
<tr>
<td><strong>Client</strong></td>
<td><strong>:</strong></td>
<td>İSDEMİR ‚ İskenderun Iron and Steel Works Co. İskenderun &#8211; Turkey</td>
</tr>
<tr>
<td><strong>Contract Date</strong></td>
<td><strong>:</strong></td>
<td>31.07.2002</td>
</tr>
<tr>
<td><strong>Duration</strong></td>
<td><strong>:</strong></td>
<td>13 Months</td>
</tr>
<tr>
<td><strong>Completion Date</strong></td>
<td><strong>:</strong></td>
<td>The project was completed on 22.04.2004.</td>
</tr>
<tr>
<td><strong>Status</strong></td>
<td><strong>:</strong></td>
<td>Main Contractor (Consortium)</td>
</tr>
<tr>
<td><strong>Percentage Of Participation</strong></td>
<td><strong>:</strong></td>
<td>30,32 %</td>
</tr>
<tr>
<td><strong>General Description Of The Project</strong></td>
<td><strong>:</strong></td>
<td>
<p class="normalYazi">The project has been performed on a turnkey basis by the consortium of EKON and CONCAST AG (Switzerland). EKON&#8217;s scope was detail engineering of localscope, all civil works, structural steel manufacturing and erection, supply anderection of mechanical equipment, piping (water, hydraulic, gases), design andinstallation of the water treatment plant and electrical and automation systemsdesign and erection works.</p>
<p class="normalYazi" style="margin-left: 1.0cm; text-indent: -1.0cm; tab-stops: 1.0cm 155.95pt 163.0pt;">
</td>
</tr>
<tr>
<td><strong>Detailed Description Of The Project</strong></td>
<td><strong>:</strong></td>
<td>Civil Works:</p>
<ul>
<li>Excavation : 4.800 m3</li>
<li>Filling : 14.700 m3</li>
<li>Reinforced Concrete : 14.000 m3</li>
<li>Formwork : 21.000 m3</li>
<li>Reinforcement (Rebars) : 850 tons</li>
<li>Steel Structure : 1400 tons</li>
</ul>
<p>Mechanical Works:</p>
<ul>
<li>Mechanical Equipment : 2200 tons</li>
<li>Hydraulic Piping : 29 tons</li>
<li>Piping (Carbon S.) : 233 tons</li>
<li>Piping (Stainless S.) : 15 tons</li>
</ul>
</td>
</tr>
<tr>
<td><strong>Liquida Damages</strong></td>
<td><strong>:</strong></td>
<td><strong>None</strong></td>
</tr>
</tbody>
</table>
]]></content:encoded>
					
					<wfw:commentRss>https://ekonas.com.tr/en/projects/isdemir-continuous-billet-casting-plant-2-000-000-t-y/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		
			</item>
		<item>
		<title>Isdemir Blast Furnace No:3 Modernization</title>
		<link>https://ekonas.com.tr/en/projects/isdemir-blast-furnace-no3-modernization/</link>
					<comments>https://ekonas.com.tr/en/projects/isdemir-blast-furnace-no3-modernization/#respond</comments>
		
		<dc:creator><![CDATA[Ekonas Site Yönetimi]]></dc:creator>
		<pubDate>Sun, 05 Jun 2022 21:10:24 +0000</pubDate>
				<guid isPermaLink="false">https://ekonas.com.tr/?post_type=portfolio&#038;p=1761</guid>

					<description><![CDATA[<p>Being one of the ISDEMIR's modernization investments, the project included all modification, erection, dismantling and relocation works of existing Blast Furnace No.3 and auxiliary plants. The modernization increased blast furnace production capacity from 1.300.000 tons/year to 1.800.000 tons/year.</p>
]]></description>
										<content:encoded><![CDATA[<table style="width: 100%;">
<tbody>
<tr>
<td style="width: 30%;"><strong>Project</strong></td>
<td style="width: 2%;"><strong>:</strong></td>
<td>Manufacturing, Civil Works and Dismantling-Erection Works Under Modernization of Isdemir Blast Furnace No:3 Investment</td>
</tr>
<tr>
<td><strong>Client</strong></td>
<td><strong>:</strong></td>
<td>İSDEMİR ‚ İskenderun Iron &amp; Steel Co.İskenderun &#8211; Turkey</td>
</tr>
<tr>
<td><strong>Consultant</strong></td>
<td><strong>:</strong></td>
<td>ERENCO &#8211; Erdemir Engineering, Management and Consulting Services Inc.</td>
</tr>
<tr>
<td><strong>Contract Date</strong></td>
<td><strong>:</strong></td>
<td>23.06.2005</td>
</tr>
<tr>
<td><strong>Duration</strong></td>
<td><strong>:</strong></td>
<td>28 Months</td>
</tr>
<tr>
<td><strong>Status</strong></td>
<td><strong>:</strong></td>
<td>Main Contractor</td>
</tr>
<tr>
<td><strong>Percentage Of Participation</strong></td>
<td><strong>:</strong></td>
<td>
<p class="normalYazi" style="margin-left: 1.0cm; text-indent: -1.0cm; tab-stops: 1.0cm 155.95pt 163.0pt;"><span lang="EN-US">100 %</span></p>
<p class="normalYazi" style="margin-left: 1.0cm; text-indent: -1.0cm; tab-stops: 1.0cm 155.95pt 163.0pt;">
</td>
</tr>
<tr>
<td><strong>General Description Of The Project</strong></td>
<td><strong>:</strong></td>
<td>Being one of the ISDEMIR&#8217;s modernization investments, the project included all modification, erection, dismantling and relocation works of existing Blast Furnace No.3 and auxiliary plants. The modernization increased blast furnace production capacity from 1.300.000 tons/year to 1.800.000 tons/year.</p>
<p>ProjectConsist of:</p>
<ul>
<li>Dismantling works of Hot Air Line Systems, Bell Type Loading System, Pump Station, Cooling system and Body of the furnace.</li>
<li>Erection works of Bell-Less Type Loading system, Body of the Furnace, Stave Cooling System, Tuyer and Tuyer Platforms, Hot Air Line systems, Skip Load system and other equipments.</li>
<li>Erection works of electrical and automation system, steel fabrication and erection, civil works.</li>
</ul>
</td>
</tr>
<tr>
<td><strong>Detailed Description Of The Project</strong></td>
<td><strong>:</strong></td>
<td>CompletedWork Items:</p>
<ul>
<li>Furnace Top Loading System was replaced by Bell ‚ Less Top System</li>
<li>Furnace shell cooling system was replaced by Stave type closed circuit cooling system and designed according to demineralized water usage</li>
<li>Hot air line system was modified by increasing Tuyer no. from 20 to 24.</li>
<li>Electrical, automation and control system was installed</li>
<li>Slag granulation plant</li>
<li>Raw material intake ramp for furnace</li>
<li>The foundations of some of the existing equipments was replaced by new foundations</li>
</ul>
<p>Main Quantities:</p>
<ul>
<li>Dismantling : 7954 tons</li>
<li>Steel Fabrication &amp; Erection : 1517 tons</li>
<li>Mechanical Equipment Erection : 1516 tons</li>
<li>Piping : 24118 m</li>
<li>Excavation : 11583 m<sup>3</sup></li>
<li>Concrete : 4823 m<sup>3</sup></li>
</ul>
</td>
</tr>
</tbody>
</table>
]]></content:encoded>
					
					<wfw:commentRss>https://ekonas.com.tr/en/projects/isdemir-blast-furnace-no3-modernization/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		
			</item>
		<item>
		<title>Isdemir Blast Furnace and BOF Gas Holders</title>
		<link>https://ekonas.com.tr/en/projects/isdemir-blast-furnace-and-bof-gas-holders/</link>
					<comments>https://ekonas.com.tr/en/projects/isdemir-blast-furnace-and-bof-gas-holders/#respond</comments>
		
		<dc:creator><![CDATA[Ekonas Site Yönetimi]]></dc:creator>
		<pubDate>Sun, 05 Jun 2022 21:10:04 +0000</pubDate>
				<guid isPermaLink="false">https://ekonas.com.tr/?post_type=portfolio&#038;p=1759</guid>

					<description><![CDATA[<p>Engineering, manufacturing, supply and erection works.</p>]]></description>
										<content:encoded><![CDATA[<table style="width: 100%;">
<tbody>
<tr>
<td style="width: 30%;"><strong>Project</strong></td>
<td style="width: 2%;"><strong>:</strong></td>
<td>İsdemir Blast Furnace and OG Gas Holders, İskenderun &#8211; Turkey</td>
</tr>
<tr>
<td><strong>Client</strong></td>
<td><strong>:</strong></td>
<td>İsdemir Iron And Steel Works Company</td>
</tr>
<tr>
<td><strong>Contract Date</strong></td>
<td><strong>:</strong></td>
<td>14.07.2004 &amp; 27.02.2006</td>
</tr>
<tr>
<td><strong>Completion Date</strong></td>
<td><strong>:</strong></td>
<td>The first stage of the project has been completed on 28.02.2006 and the second stage completed on 25.03.2009.</td>
</tr>
<tr>
<td><strong>Duration</strong></td>
<td><strong>:</strong></td>
<td>2 x 24 Months (The project has been performed in two stages)</td>
</tr>
<tr>
<td><strong>Status</strong></td>
<td><strong>:</strong></td>
<td>EPC Contractor</td>
</tr>
<tr>
<td><strong>Percentage Of Participation</strong></td>
<td><strong>:</strong></td>
<td>100 %</td>
</tr>
<tr>
<td><strong>General Description Of The Project</strong></td>
<td><strong>:</strong></td>
<td>Engineering, manufacturing, supply and erection works.</td>
</tr>
<tr>
<td><strong>Detailed Description Of The Project</strong></td>
<td><strong>:</strong></td>
<td>The project has been realized as an EPC Contract in turnkey basis for ISDEMIR İskenderun Iron and Steel Company in Turkey. The project consisted of floating piston type two gas holders and piping system, excess gas flare stack, converter gas recovery, boosting, filtration and mixing stations. The gas holders were constructed to store blast furnace and converter gases produced in ISDEMIR Plant. Our main technological sub-contractors were MB Engineering Services Ltd., Clayton Walker Gas Holder Division (England) and SMS Demag AG (Germany).</p>
<p>Scope:</p>
<ul>
<li>Detailed Engineering Works</li>
<li>Supply, Manufacturing and Erection Works</li>
<li>Ex-proof Electrical and Automation System Supply and Erection Works</li>
<li>Commissioning and Start-up</li>
</ul>
<p>Main Quantities:</p>
<ul>
<li>Blast Furnace Gas Holder of a Capacity : 50,000 m3 Dia= 43 m, H= 54 m</li>
<li>BOF Gas Holder of a Capacity : 60,000 m3 Dia=48.4 m, H= 59 m</li>
<li>3 nos of Gas Export Stations each one including boost fan and wet type ESP</li>
<li>One Mixing Station</li>
<li>One Excess Flare Stack</li>
</ul>
</td>
</tr>
</tbody>
</table>
]]></content:encoded>
					
					<wfw:commentRss>https://ekonas.com.tr/en/projects/isdemir-blast-furnace-and-bof-gas-holders/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		
			</item>
		<item>
		<title>İsdemir Air Separation Plant No:6</title>
		<link>https://ekonas.com.tr/en/projects/isdemir-air-separation-plant-no6/</link>
					<comments>https://ekonas.com.tr/en/projects/isdemir-air-separation-plant-no6/#respond</comments>
		
		<dc:creator><![CDATA[Ekonas Site Yönetimi]]></dc:creator>
		<pubDate>Sun, 05 Jun 2022 21:09:52 +0000</pubDate>
				<guid isPermaLink="false">https://ekonas.com.tr/?post_type=portfolio&#038;p=1757</guid>

					<description><![CDATA[<p>Engineering, manufacturing, supply and erection works.</p>
<p><strong></strong></p>]]></description>
										<content:encoded><![CDATA[<table style="width: 100%;">
<tbody>
<tr>
<td style="width: 30%;"><strong>Project</strong></td>
<td style="width: 2%;"><strong>:</strong></td>
<td>İsdemir Air Separation Plant No:6</td>
</tr>
<tr>
<td><strong>Client</strong></td>
<td><strong>:</strong></td>
<td>İskenderun Iron and Steel Inc.</td>
</tr>
<tr>
<td><strong>Contract Date</strong></td>
<td><strong>:</strong></td>
<td>05.04.2004</td>
</tr>
<tr>
<td><strong>Completion Date</strong></td>
<td><strong>:</strong></td>
<td>The project has been completed on 01.12.2005.</td>
</tr>
<tr>
<td><strong>Duration</strong></td>
<td><strong>:</strong></td>
<td>20 Months</td>
</tr>
<tr>
<td><strong>Status</strong></td>
<td><strong>:</strong></td>
<td>Subcontractor</td>
</tr>
<tr>
<td><strong>Percentage Of Participation</strong></td>
<td><strong>:</strong></td>
<td>100 %</td>
</tr>
<tr>
<td><strong>General Description Of The Project</strong></td>
<td><strong>:</strong></td>
<td>Engineering, manufacturing, supply and erection works.</td>
</tr>
<tr>
<td><strong>Detailed Description Of The Project</strong></td>
<td><strong>:</strong></td>
<td>İşdemir İskenderun Iron &amp; Steel Company&#8217;s 610 tons/day capacity Air Separation Plant No: 6 project having a capacity of 18,000 Nm3/h oxygen, 12,000 Nm3/h nitrogen and 600 Nm3/h argon has been established to produce oxygen, nitrogen and argon required in BOF Plant, Blast Furnaces and other required points of İşdemir. The project has been completed for Air Liquide (France) as a subcontractor. The project had two separate phases.</p>
<p>Scope of first phase:</p>
<ul>
<li>Detailed Engineering of Infrastructure and Superstructure</li>
<li>Manufacturing of Structural Steel</li>
<li>Construction of Equipment Foundations</li>
<li>Construction of Process, Electrical and Control Buildings</li>
<li>Earthing and Underground Piping Networks</li>
</ul>
<p>Scope of second phase:</p>
<ul>
<li>Erection of the Main Process Equipments(Storage Vessels, Compressor, Turbine, Cold Box, Pumps, etc.)</li>
<li>Erection of Double-Shell Tank for Storage of Liquid Oxygen</li>
<li>Carbon and Stainless Steel Process Piping Fabrication and Erection</li>
<li>Electrical and Instrumentation Erection Works</li>
<li>Dust Perlite Insulation Works</li>
</ul>
</td>
</tr>
</tbody>
</table>
]]></content:encoded>
					
					<wfw:commentRss>https://ekonas.com.tr/en/projects/isdemir-air-separation-plant-no6/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		
			</item>
		<item>
		<title>Erdemir Blast Furnace and OG Gas Holders</title>
		<link>https://ekonas.com.tr/en/projects/erdemir-blast-furnace-and-og-gas-holders/</link>
					<comments>https://ekonas.com.tr/en/projects/erdemir-blast-furnace-and-og-gas-holders/#respond</comments>
		
		<dc:creator><![CDATA[Ekonas Site Yönetimi]]></dc:creator>
		<pubDate>Sun, 05 Jun 2022 21:09:36 +0000</pubDate>
				<guid isPermaLink="false">https://ekonas.com.tr/?post_type=portfolio&#038;p=1755</guid>

					<description><![CDATA[<p>Engineering, manufacturing, supply and erection works.</p>]]></description>
										<content:encoded><![CDATA[<table style="width: 100%;">
<tbody>
<tr>
<td style="width: 30%;"><strong>Project</strong></td>
<td style="width: 2%;"><strong>:</strong></td>
<td>Erdemir Blast Furnace And Og Gas Holders, Kdz. Ereğli &#8211; Turkey</td>
</tr>
<tr>
<td><strong>Client</strong></td>
<td><strong>:</strong></td>
<td>Ereğli Iron And Steel Works Company</td>
</tr>
<tr>
<td><strong>Contract Date</strong></td>
<td><strong>:</strong></td>
<td>16.03.1993</td>
</tr>
<tr>
<td><strong>Completion Date</strong></td>
<td><strong>:</strong></td>
<td>The project has been completed on 16.07.1998.</td>
</tr>
<tr>
<td><strong>Duration</strong></td>
<td><strong>:</strong></td>
<td>64 Months</td>
</tr>
<tr>
<td><strong>Status</strong></td>
<td><strong>:</strong></td>
<td>Nominated Subcontractor</td>
</tr>
<tr>
<td><strong>Percentage Of Participation</strong></td>
<td><strong>:</strong></td>
<td>100 %</td>
</tr>
<tr>
<td><strong>General Description Of The Project</strong></td>
<td><strong>:</strong></td>
<td>Engineering, manufacturing, supply and erection works.</td>
</tr>
<tr>
<td><strong>Detailed Description Of The Project</strong></td>
<td><strong>:</strong></td>
<td>ERDEMİR Ereğli Iron &amp; Steel Company&#8217;s Blast Furnace and Converter Gases Storage Plant has been completed on turnkey basis in cooperation with Walker Engineering Ltd. (England) and Davy McKee (England). The plant consists of two floating piston type gas holders each having 40,000 m3 storage capacity, piping system, booster and mixing stations.</p>
<p>Scope:</p>
<ul>
<li>Detailed Engineering Works</li>
<li>Supply, Manufacturing and Erection Works</li>
<li>Ex-proof Electrical and Automation System Supply and Erection Works</li>
<li>Commissioning and Start-up</li>
</ul>
<p>Main Quantities:</p>
<ul>
<li>Capacity : 2 x 40,000 m3</li>
<li>Diameter : 43 m</li>
<li>Height : 52 m</li>
<li>Outer frame &amp; shell of tank : 2,500 tons</li>
</ul>
</td>
</tr>
</tbody>
</table>
]]></content:encoded>
					
					<wfw:commentRss>https://ekonas.com.tr/en/projects/erdemir-blast-furnace-and-og-gas-holders/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		
			</item>
		<item>
		<title>Erdemir Air Separation Plant No:6</title>
		<link>https://ekonas.com.tr/en/projects/erdemir-air-separation-plant-no6/</link>
					<comments>https://ekonas.com.tr/en/projects/erdemir-air-separation-plant-no6/#respond</comments>
		
		<dc:creator><![CDATA[Ekonas Site Yönetimi]]></dc:creator>
		<pubDate>Sun, 05 Jun 2022 21:09:23 +0000</pubDate>
				<guid isPermaLink="false">https://ekonas.com.tr/?post_type=portfolio&#038;p=1753</guid>

					<description><![CDATA[<p>Engineering, manufacturing, supply and erection works.</p>]]></description>
										<content:encoded><![CDATA[<table style="width: 100%;">
<tbody>
<tr>
<td style="width: 30%;"><strong>Project</strong></td>
<td style="width: 2%;"><strong>:</strong></td>
<td>Erdemir Air Separation Plant No:6, Kdz. Ereğli &#8211; Turkey</td>
</tr>
<tr>
<td><strong>Client</strong></td>
<td><strong>:</strong></td>
<td>Ereğli Iron And Steel Works Company</td>
</tr>
<tr>
<td><strong>Contract Date</strong></td>
<td><strong>:</strong></td>
<td>13.04.2004</td>
</tr>
<tr>
<td><strong>Completion Date</strong></td>
<td><strong>:</strong></td>
<td>The Date of Commercial Operation Certificate for Air Separation Plant No.6 is on December 11, 2006 and Final Acceptance Certificate is on November 30, 2007.</td>
</tr>
<tr>
<td><strong>Duration</strong></td>
<td><strong>:</strong></td>
<td>20 Months</td>
</tr>
<tr>
<td><strong>Status</strong></td>
<td><strong>:</strong></td>
<td>Main Local Sub Supplier</td>
</tr>
<tr>
<td><strong>Percentage Of Participation</strong></td>
<td><strong>:</strong></td>
<td>100 %</td>
</tr>
<tr>
<td><strong>General Description Of The Project</strong></td>
<td><strong>:</strong></td>
<td>Engineering, manufacturing, supply and erection works.</td>
</tr>
<tr>
<td><strong>Detailed Description Of The Project</strong></td>
<td><strong>:</strong></td>
<td><strong>Engineering:</strong>The detail design of Steel Structures (pipe racks, pipe supports, ladders, platforms, etc.), Spray Cooler Vessel (incl. accessories), Evaporative Cooler Vessel (incl. Accessories), Cooling Tower (incl. accessories), Cranes (for machine shop and cold box), Connection Box for Pumps.</p>
<p><strong>Manufacturing :</strong> All the designed equipments and steel structures.</p>
<p><strong>Supply :</strong> The Pipes, Fittings and 250 kVA Diesel Generator.</p>
<p><strong>Erection:</strong> Cold Box.</td>
</tr>
</tbody>
</table>
]]></content:encoded>
					