<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>Industrial Plants &#8211; EKON Endüstri İnşaat ve Ticaret A.Ş</title>
	<atom:link href="https://ekonas.com.tr/en/projects_cat/industrial-plants/feed/" rel="self" type="application/rss+xml" />
	<link>https://ekonas.com.tr</link>
	<description></description>
	<lastBuildDate>Wed, 08 Jun 2022 20:13:34 +0000</lastBuildDate>
	<language>en-US</language>
	<sy:updatePeriod>
	hourly	</sy:updatePeriod>
	<sy:updateFrequency>
	1	</sy:updateFrequency>
	<generator>https://wordpress.org/?v=6.8.1</generator>
	<item>
		<title>Etimaden Emet Sulphuric Acid Plant (350.000 ton/year)</title>
		<link>https://ekonas.com.tr/en/projects/etimaden-emet-sulphuric-acid-plant-350-000-ton-year/</link>
					<comments>https://ekonas.com.tr/en/projects/etimaden-emet-sulphuric-acid-plant-350-000-ton-year/#respond</comments>
		
		<dc:creator><![CDATA[ekonas_yonetim]]></dc:creator>
		<pubDate>Wed, 08 Jun 2022 20:13:34 +0000</pubDate>
				<guid isPermaLink="false">https://ekonas.com.tr/?post_type=portfolio&#038;p=2038</guid>

					<description><![CDATA[The project consists of the engineering, procurement and construction/installation works to be carried out for turnkey construction of a sulfuric acid production plant. The plant will be established at Etimaden İşletmeleri Genel Müdürlüğü Emet Bor İşletmeleri (Emet-Kütahya) It has a capacity of 350,000 ton/year on sulfur basis (based on an operation of 330 days of [&#8230;]]]></description>
										<content:encoded><![CDATA[<ul>
<li>The project consists of the engineering, procurement and construction/installation works to be carried out for turnkey construction of a sulfuric acid production plant.</li>
<li>The plant will be established at Etimaden İşletmeleri Genel Müdürlüğü Emet Bor İşletmeleri (Emet-Kütahya)</li>
<li>It has a capacity of 350,000 ton/year on sulfur basis (based on an operation of 330 days of a year and 24 hours of a day, 100% H2SO4)</li>
<li>The project concerns a PLANT for the production of sulfuric acid, co-producing steam and electric energy (15 MW), starting from solid sulfur, and based on dry – double conversion double absorption (DCDA) process, provided with Heat Recovery System.</li>
<li>Plant includes auxiliary units such as demineralized water plant, compressed air system, auxiliary boiler, cooling water system, handling and storage systems.</li>
</ul>
]]></content:encoded>
					
					<wfw:commentRss>https://ekonas.com.tr/en/projects/etimaden-emet-sulphuric-acid-plant-350-000-ton-year/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		
			</item>
		<item>
		<title>Boğazlıyan Sugar Factory (10000 T/D)</title>
		<link>https://ekonas.com.tr/en/projects/bogazliyan-sugar-factory-10000-t-d/</link>
					<comments>https://ekonas.com.tr/en/projects/bogazliyan-sugar-factory-10000-t-d/#respond</comments>
		
		<dc:creator><![CDATA[Ekonas Site Yönetimi]]></dc:creator>
		<pubDate>Sun, 05 Jun 2022 21:21:13 +0000</pubDate>
				<guid isPermaLink="false">https://ekonas.com.tr/?post_type=portfolio&#038;p=1818</guid>

					<description><![CDATA[<p>Turnkey Construction of Sugar Factory having 10,000 (ten thousand) Tons/ Day Actual Beet Processing Capacity.</p>]]></description>
										<content:encoded><![CDATA[<table style="width: 100%;">
<tbody>
<tr>
<td style="width: 30%;"><strong>Project</strong></td>
<td style="width: 2%;"><strong>:</strong></td>
<td>Boğazlıyan Sugar Factory(10000 T/D)</td>
</tr>
<tr>
<td><strong>Client</strong></td>
<td><strong>:</strong></td>
<td>Kayseri Sugar Factory Co.</td>
</tr>
<tr>
<td><strong>Contract Date</strong></td>
<td><strong>:</strong></td>
<td>
<p class="normalYazi" style="margin-left: 1.0cm; text-indent: -1.0cm; tab-stops: 1.0cm 155.95pt 163.0pt;">December 2004</p>
</td>
</tr>
<tr>
<td><strong>Commencement Date</strong></td>
<td><strong>:</strong></td>
<td>01 July 2005</td>
</tr>
<tr>
<td><strong>Completion Date</strong></td>
<td><strong>:</strong></td>
<td>First sugar production is realized on 03.Dec.2006 and Provisional acceptance is achieved on 06 November 2007</td>
</tr>
<tr>
<td><strong>Status</strong></td>
<td><strong>:</strong></td>
<td>Consortium</td>
</tr>
<tr>
<td><strong>Percentage Of Participation</strong></td>
<td><strong>:</strong></td>
<td>Project is completed by Consortium of FIVES CAIL-MAGUIN-(OYAK-EKON-PROKON JV) FIVES CAIL-MAGUIN are suppliers of know-how and some parts of equipments. Participation Percentage of OYAK-EKON-PROKON JV is as mentioned below,</p>
<ul>
<li>OYAK : 45 %</li>
<li>EKON : 45 %</li>
<li>PROKON : 10 %</li>
</ul>
</td>
</tr>
<tr>
<td><strong>General Description Of The Project</strong></td>
<td><strong>:</strong></td>
<td>Turnkey Construction of Sugar Factory having 10,000 (ten thousand) Tons/ Day Actual Beet Processing Capacity.</td>
</tr>
<tr>
<td><strong>Detailed Description Of</strong><strong>The Project</strong></td>
<td><strong>:</strong></td>
<td>
<ul>
<li>Beet Yard : 52.500 m¬≤</li>
<li>Beet Conveyor : 650 m</li>
<li>Beet Washing Plant</li>
<li>Main Process Building : 130 m x 30 m x 21 m</li>
<li>Diffusion Tower and Cassette Mixer</li>
<li>Pulp Conveyor</li>
<li>Juice Purification</li>
<li>Evaporation</li>
<li>Crystallization</li>
<li>Sugar Drying Building and equipment</li>
<li>Sugar Conveying</li>
<li>Horizontal Sugar Silo Building : 60.000 TON</li>
<li>Bagged Sugar Storage Building : 20.000 TON</li>
<li>Milk of Lime Production Building : 500 m¬≥</li>
<li>Cooling Tower</li>
<li>Boiler Building : 2 x 75 T/h<br />
20 T/Hour + 10 T/Hour</li>
</ul>
<ul>
<li>Turbine Building : 2 x 7.5 MW</li>
<li>Piping : 45.000 m (various)</li>
<li>Molasses Tanks : 2 x 11.000 TON</li>
<li>Fuel Oil Tank : 000 TON</li>
<li>Waste Water Treatment Plant</li>
<li>Administration and Social Buildings</li>
</ul>
<p>Completed works;</p>
<ul>
<li>Excavation : 350.000 m¬≥</li>
<li>Concrete : 000 m¬≥</li>
<li>Steel Structure : 200 TON</li>
<li>Electrical System (Complete)</li>
<li>Automation System</li>
<li>Instrumentation</li>
</ul>
</td>
</tr>
</tbody>
</table>
]]></content:encoded>
					
					<wfw:commentRss>https://ekonas.com.tr/en/projects/bogazliyan-sugar-factory-10000-t-d/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		
			</item>
		<item>
		<title>Boğazlıyan Sugar Factory Road Construction Works  (10000 T/D)</title>
		<link>https://ekonas.com.tr/en/projects/bogazliyan-sugar-factory-road-construction-works-10000-t-d/</link>
					<comments>https://ekonas.com.tr/en/projects/bogazliyan-sugar-factory-road-construction-works-10000-t-d/#respond</comments>
		
		<dc:creator><![CDATA[Ekonas Site Yönetimi]]></dc:creator>
		<pubDate>Sun, 05 Jun 2022 21:08:38 +0000</pubDate>
				<guid isPermaLink="false">https://ekonas.com.tr/?post_type=portfolio&#038;p=1747</guid>

					<description><![CDATA[<p>The project covered the construction of the roads for the Boğazlıyan Sugar Factory.</p>]]></description>
										<content:encoded><![CDATA[<table style="width: 100%;">
<tbody>
<tr>
<td style="width: 30%;"><strong>Project</strong></td>
<td style="width: 2%;"><strong>:</strong></td>
<td>Boğazlıyan Sugar FactoryRoad Construction Works</td>
</tr>
<tr>
<td><strong>Client</strong></td>
<td><strong>:</strong></td>
<td>Kayseri Sugar Factory Co.</td>
</tr>
<tr>
<td><strong>Contract Date</strong></td>
<td><strong>:</strong></td>
<td>
<p class="normalYazi" style="margin-left: 1.0cm; text-indent: -1.0cm; tab-stops: 1.0cm 155.95pt 163.0pt;"><span lang="EN-US">16.08.2005</span></p>
</td>
</tr>
<tr>
<td><strong>Completion Date</strong></td>
<td><strong>:</strong></td>
<td>The project was completed on 15.08.2006.</td>
</tr>
<tr>
<td><strong>Duration</strong></td>
<td><strong>:</strong></td>
<td>12 Months</td>
</tr>
<tr>
<td><strong>Status</strong></td>
<td><strong>:</strong></td>
<td>Main Contractor</td>
</tr>
<tr>
<td><strong>Percentage Of Participation</strong></td>
<td><strong>:</strong></td>
<td>100 %</td>
</tr>
<tr>
<td><strong>General Description Of The Project</strong></td>
<td><strong>:</strong></td>
<td>The project covered the construction of the roads for the Boğazlıyan Sugar Factory.</td>
</tr>
<tr>
<td><strong>Detailed Description Of The Project</strong></td>
<td><strong>:</strong></td>
<td>
<ul>
<li>Excavation : 113,000 m3</li>
<li>Fill : 171,000 m3</li>
<li>Total Concrete : 22,000 m2</li>
<li>Asphalt Lining : 21,000 m2</li>
<li>Kerb Stone : 14,000 m</li>
</ul>
</td>
</tr>
<tr>
<td><strong>Liquida Ted Damages</strong></td>
<td><strong>:</strong></td>
<td>None</td>
</tr>
</tbody>
</table>
]]></content:encoded>
					
					<wfw:commentRss>https://ekonas.com.tr/en/projects/bogazliyan-sugar-factory-road-construction-works-10000-t-d/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		
			</item>
	</channel>
</rss>