<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>Cement Industry &#8211; EKON Endüstri İnşaat ve Ticaret A.Ş</title>
	<atom:link href="https://ekonas.com.tr/en/projects_cat/cement-industry/feed/" rel="self" type="application/rss+xml" />
	<link>https://ekonas.com.tr</link>
	<description></description>
	<lastBuildDate>Tue, 07 Jun 2022 10:29:03 +0000</lastBuildDate>
	<language>en-US</language>
	<sy:updatePeriod>
	hourly	</sy:updatePeriod>
	<sy:updateFrequency>
	1	</sy:updateFrequency>
	<generator>https://wordpress.org/?v=6.8.1</generator>
	<item>
		<title>Trabzon Cement Grinding Plant (85 T/H)</title>
		<link>https://ekonas.com.tr/en/projects/trabzon-cement-grinding-plant-85-t-h/</link>
					<comments>https://ekonas.com.tr/en/projects/trabzon-cement-grinding-plant-85-t-h/#respond</comments>
		
		<dc:creator><![CDATA[Ekonas Site Yönetimi]]></dc:creator>
		<pubDate>Sun, 05 Jun 2022 21:05:34 +0000</pubDate>
				<guid isPermaLink="false">https://ekonas.com.tr/?post_type=portfolio&#038;p=1727</guid>

					<description><![CDATA[<p>The project has been performed on a turnkey basis.</p>]]></description>
										<content:encoded><![CDATA[<table style="width: 100%;">
<tbody>
<tr>
<td style="width: 30%;"><strong>Project</strong></td>
<td style="width: 2%;">:</td>
<td>
<p class="normalYazi" style="margin-left: 28.5pt; text-indent: -28.5pt; tab-stops: 155.95pt;">Trabzon Cement Factory Grinding Plant With Capacity 85 Tons/HR</p>
</td>
</tr>
<tr>
<td><strong>Client</strong></td>
<td>:</td>
<td>Aşkale Cement Industry Inc.</td>
</tr>
<tr>
<td><strong>Contract Date</strong></td>
<td>:</td>
<td>04.09.2006</td>
</tr>
<tr>
<td><strong>Completion Date</strong></td>
<td><strong>:</strong></td>
<td>The project was completed on 22.05.2007.</td>
</tr>
<tr>
<td><strong>Duration</strong></td>
<td>:</td>
<td>7Months</td>
</tr>
<tr>
<td><strong>Status</strong></td>
<td>:</td>
<td>Sub-Contractor</td>
</tr>
<tr>
<td><strong>Percentage Of Participation</strong></td>
<td>:</td>
<td>100 %</td>
</tr>
<tr>
<td><strong>General Description Of The Project</strong></td>
<td>:</td>
<td>The project has been performed on a turnkey basis.</td>
</tr>
<tr>
<td><strong>Detailed Description Of The Project</strong></td>
<td>:</td>
<td>
<ul>
<li>System design,</li>
<li>Civil works,</li>
<li>Conveying systems,</li>
<li>Manufacturing and erection of filters and steel structures,</li>
<li>Dosing weight feeders,</li>
<li>Electrical &amp; automation works,</li>
<li>Start up and commissioning.</li>
</ul>
</td>
</tr>
<tr>
<td><strong>Liquidated Damages</strong></td>
<td><strong>:</strong></td>
<td>None</td>
</tr>
<tr>
<td><strong>Main Sub- Suppliers</strong></td>
<td><strong>:</strong></td>
<td>None</td>
</tr>
</tbody>
</table>
]]></content:encoded>
					
					<wfw:commentRss>https://ekonas.com.tr/en/projects/trabzon-cement-grinding-plant-85-t-h/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		
			</item>
		<item>
		<title>Hasanoğlan Cement Plant (2500 T/D)</title>
		<link>https://ekonas.com.tr/en/projects/hasanoglan-cement-plant-2500-t-d/</link>
					<comments>https://ekonas.com.tr/en/projects/hasanoglan-cement-plant-2500-t-d/#respond</comments>
		
		<dc:creator><![CDATA[Ekonas Site Yönetimi]]></dc:creator>
		<pubDate>Sun, 05 Jun 2022 21:05:17 +0000</pubDate>
				<guid isPermaLink="false">https://ekonas.com.tr/?post_type=portfolio&#038;p=1725</guid>

					<description><![CDATA[<p>The project covers the engineering, procurement, construction (civil, mechanical, electrical and automation works), commissioning and start up of 2500 tons/day a new greenfield clinker burning line, cement additives and cement grinding facilities project.</p>]]></description>
										<content:encoded><![CDATA[<table style="width: 100%;">
<tbody>
<tr>
<td style="width: 30%;"><strong>Project</strong></td>
<td style="width: 2%;">:</td>
<td>
<p class="normalYazi" style="margin-left: 28.5pt; text-indent: -28.5pt; tab-stops: 155.95pt;">EPC Contract For 2500 Tons/Day New Clinker Line At Hasanoğlan In Ankara</p>
</td>
</tr>
<tr>
<td><strong>Client</strong></td>
<td>:</td>
<td>Çimpor Yibitaş</td>
</tr>
<tr>
<td><strong>Contract Date</strong></td>
<td>:</td>
<td>20.08.2007</td>
</tr>
<tr>
<td><strong>Completion Date</strong></td>
<td><strong>:</strong></td>
<td>The Provisional Acceptance Certificate has been received on 25.12.2009</td>
</tr>
<tr>
<td><strong>Duration</strong></td>
<td>:</td>
<td>24,5 Months</td>
</tr>
<tr>
<td><strong>Status</strong></td>
<td>:</td>
<td>MainContractor</td>
</tr>
<tr>
<td><strong>Percentage Of Participation</strong></td>
<td>:</td>
<td>100 %</td>
</tr>
<tr>
<td><strong>General Description Of The Project</strong></td>
<td>:</td>
<td>The project covers the engineering, procurement, construction (civil, mechanical, electrical and automation works), commissioning and start up of 2500 tons/day a new greenfield clinker burning line, cement additives and cement grinding facilities project.</td>
</tr>
<tr>
<td><strong>Detailed Description Of The Project</strong></td>
<td>:</td>
<td>
<ol>
<li>The Quarry &amp; crushing : Raw Material Transport to Storage, Clay Crusher, Clay Transport to Storage, Clay Storage</li>
<li>Raw Mix : Raw Material Storage, Raw Material Reclaiming, Raw Mill Hoppers and Raw Mill, Homogeneous Silo Feeding, Clay Reclaiming</li>
<li>Burning : Homogenization Silo, Pre-heater Feeding, Pre-heatter, Raw Mill Dedusting, Kiln, Cooler, Cooler Dedusting, Cooler Discharge</li>
<li>Clinker Silo &#8211; Cement Additives : Secondary Crusher, Cement Additives Storage, Clinker Silo, Clinker Silo Discharge, Cement Additives Reclaiming, Cement Mill hoppers</li>
<li>Cement grinding and Shipping</li>
<li>Fuels : Coal Storage, Coal Reclaiming, Coal Mill</li>
<li>Process Stages : Entrance, Parking lots, Roads , Site Levelling and retaining walls</li>
<li>Electrical Works : Medium Voltage Distribution System (MV), Low Voltage Distribution System (LV), Lighting and Power outlet system, Power Distribution Control System (HV, MV, LV), Automation Systems, Communication Systems, Fire protection, Electrical Rooms</li>
<li>Auxiliaries : Potable water , Industrial water, Fire fighting water network. , Rain and run off water, Compressed air system. , Naturel Gas Network,</li>
<li>Engineering and project management works</li>
<li>Site service,supervisor,commissioning and training</li>
</ol>
</td>
</tr>
<tr>
<td><strong>Liquidated Damages</strong></td>
<td><strong>:</strong></td>
<td>None</td>
</tr>
<tr>
<td><strong>Main Sub- Suppliers</strong></td>
<td><strong>:</strong></td>
<td>KHD HUMBOLT WEDAG ‚Äì Germany<br />
GEBR PFEIFFER AG &#8211; Germany<br />
BEDESCHI</td>
</tr>
</tbody>
</table>
]]></content:encoded>
					
					<wfw:commentRss>https://ekonas.com.tr/en/projects/hasanoglan-cement-plant-2500-t-d/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		
			</item>
		<item>
		<title>Djebel Ressas Cement Plant (5800 T/D)</title>
		<link>https://ekonas.com.tr/en/projects/djebel-ressas-cement-plant-5800-t-d/</link>
					<comments>https://ekonas.com.tr/en/projects/djebel-ressas-cement-plant-5800-t-d/#respond</comments>
		
		<dc:creator><![CDATA[Ekonas Site Yönetimi]]></dc:creator>
		<pubDate>Sun, 05 Jun 2022 21:04:52 +0000</pubDate>
				<guid isPermaLink="false">https://ekonas.com.tr/?post_type=portfolio&#038;p=1723</guid>

					<description><![CDATA[<p>Within the content of the project, EKON shall perform the engineering and execution of civil works, structuralsteel, mechanical, electrical erection, automation andcommissioning works of the plant</p>]]></description>
										<content:encoded><![CDATA[<table style="width: 100%;">
<tbody>
<tr>
<td style="width: 30%;"><strong>Project</strong></td>
<td style="width: 2%;"><strong>:</strong></td>
<td>
<p class="normalYazi" style="margin-left: 28.5pt; text-indent: -28.5pt; tab-stops: 155.95pt;">5800 Tons / Day Clinker Capacity Djebel Ressas Cement Plant Tunisia</p>
</td>
</tr>
<tr>
<td><strong>Client</strong></td>
<td><strong>:</strong></td>
<td>Carthage Cement</td>
</tr>
<tr>
<td><strong>Consultant</strong></td>
<td><strong>:</strong></td>
<td>PEG S.A. (Switzerland)</td>
</tr>
<tr>
<td><strong>Contract Date</strong></td>
<td><strong>:</strong></td>
<td>24.02.2010 (Effectuation Date: 24.05.2010)</td>
</tr>
<tr>
<td><strong>Duration</strong></td>
<td><strong>:</strong></td>
<td>26 Months + 21 Days (First Clinker) + 13,5 Months (time extension)</td>
</tr>
<tr>
<td><strong>Status</strong></td>
<td><strong>:</strong></td>
<td>EPC Contractor</td>
</tr>
<tr>
<td><strong>Percentage Of Participation</strong></td>
<td><strong>:</strong></td>
<td>The project shall be realized by EKON‚ÄìPROKON‚ÄìFLSmidth Consortium</td>
</tr>
<tr>
<td><strong>General Description Of The Project</strong></td>
<td><strong>:</strong></td>
<td>Within the content of the project:</p>
<ul>
<li>EKON shall perform the engineering and execution of civil works, structuralsteel, mechanical, electrical erection, automation and commissioning worksof the plant,</li>
<li>PROKON shall provide some mechanical equipments and shall carry out theengineering and supply of steel structure of the plant,</li>
<li>FLS shall carry out the equipment and engineering supply of the plant.</li>
</ul>
</td>
</tr>
<tr>
<td><strong>Detailed Description Of The Project</strong></td>
<td><strong>:</strong></td>
<td>The plant is located approx. 25 km south of Capital of Tunisia (Tunis) near an existing quarry and will have a total clinker production capacity of 5.800 tons/day. Scope of works covers manufacturing and erection of 8.000tons steel structures and 12,500tons of steel equipment, in total 20,500tons. The &#8220;Greenfield&#8221; project consists of the following departments:</p>
<ul>
<li>Raw material crushing, conveying and storage</li>
<li>Coal intake, storage, transport</li>
<li>Additive crushing, intake, storage, transport</li>
<li>Raw mill</li>
<li>Homogenization Silo</li>
<li>Preheater, Kiln, Clinker Cooler</li>
<li>By-pass system</li>
<li>Coal Mill</li>
<li>Clinker transport and storage</li>
<li>Cement Mill (1 and 2)</li>
<li>Cement Silos (1, 2 and 3)</li>
<li>Packing Plant (4 units)</li>
<li>Bulk dispatch to trucks</li>
<li>Bag dispatch to trucks (4 units)</li>
<li>Palletizing plant</li>
<li>Alternative liquid fuel storage</li>
<li>Natural gas distribution</li>
<li>Compressor rooms</li>
<li>Water treatment and distribution</li>
<li>Potable water unit</li>
<li>Weighbridges</li>
<li>Electrical substations</li>
<li>Central control room and laboratory</li>
<li>Service Buildings (Workshop, Changing room, open/closed storage, canteen, administration building, guard house)</li>
</ul>
</td>
</tr>
</tbody>
</table>
]]></content:encoded>
					
					<wfw:commentRss>https://ekonas.com.tr/en/projects/djebel-ressas-cement-plant-5800-t-d/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		
			</item>
		<item>
		<title>Çimko Narlı Cement Plant (7500 T/D)</title>
		<link>https://ekonas.com.tr/en/projects/cimko-narli-cement-plant-7500-t-d/</link>
					<comments>https://ekonas.com.tr/en/projects/cimko-narli-cement-plant-7500-t-d/#respond</comments>
		
		<dc:creator><![CDATA[Ekonas Site Yönetimi]]></dc:creator>
		<pubDate>Sun, 05 Jun 2022 21:04:28 +0000</pubDate>
				<guid isPermaLink="false">https://ekonas.com.tr/?post_type=portfolio&#038;p=1721</guid>

					<description><![CDATA[<p>The project covered the turnkey construction of 7500 tons/day clinker (in one line) capacity cement plant and the factory has been known ...]]></description>
										<content:encoded><![CDATA[<table style="width: 100%;">
<tbody>
<tr>
<td style="width: 30%;"><strong>Project</strong></td>
<td style="width: 2%;"><strong>:</strong></td>
<td>
<p class="normalYazi" style="margin-left: 28.5pt; text-indent: -28.5pt; tab-stops: 155.95pt;">7500 Tons/Day Clinker Capacity Çimko Narlı Cement Plant, Kahramanmaraş -Turkey</p>
</td>
</tr>
<tr>
<td><strong>Client</strong></td>
<td><strong>:</strong></td>
<td>ÇİMKO Cement and Concrete Industry Company</td>
</tr>
<tr>
<td><strong>Contract Date</strong></td>
<td><strong>:</strong></td>
<td>10.05.2006</td>
</tr>
<tr>
<td><strong>Completion Date</strong></td>
<td><strong>:</strong></td>
<td>The factory has produced its first cement on 31.12.2007 and the Temporary Completion Certificate has been received on 31.01.2008.</td>
</tr>
<tr>
<td><strong>Duration</strong></td>
<td><strong>:</strong></td>
<td>18 Months</td>
</tr>
<tr>
<td><strong>Status</strong></td>
<td><strong>:</strong></td>
<td>MainContractor</td>
</tr>
<tr>
<td><strong>Percentage Of Participation</strong></td>
<td><strong>:</strong></td>
<td>100 %</td>
</tr>
<tr>
<td><strong>General Description Of The Project</strong></td>
<td><strong>:</strong></td>
<td>The project covered the turnkey construction of 7500 tons/day clinker (in one line) capacity cement plant and the factory has been known as the biggest cement production line of Turkey with its single kiln, stock hall and silo capacities.</p>
<p>The project has been realized as an EPC Contract including the entire design works starting from the lay-out to detail shop drawings, complete local fabrication, civil works and mechanical erection works of the factory.</td>
</tr>
<tr>
<td><strong>Detailed Description Of The Project</strong></td>
<td><strong>:</strong></td>
<td>The plant has the following units :</p>
<ul>
<li>Coal Crushing Plant</li>
<li>Circular Coal Mixing Bed</li>
<li>Shale Crushing Building</li>
<li>Longitudinal Shale Blending Bed</li>
<li>Limestone and Shale Crushing Plant</li>
<li>Circular Limestone Blending Bed</li>
<li>Circular Shale Blending Bed</li>
<li>Raw Material Storage Bins</li>
<li>Raw Mills and Bag Filters (3 Nos. 280 t/h each)</li>
<li>Hot Gas Ducts and Cooling Towers (3 Nos.)</li>
<li>Raw Mill Silos (2 nos. 20.000 tons each)</li>
<li>Coal Mills and Bag Filters (2 Nos. 35 t/h each)</li>
<li>Preheater Tower</li>
<li>Rotary Kiln and Tertiary Air Duct</li>
<li>Clinker Cooler and ESP</li>
<li>Clinker Silo (250.000 tons)</li>
<li>Additive Storage Bins</li>
<li>Cement Mills (3 Nos. 180 t/h each)</li>
<li>Cement Silos (4 Nos. 20.000 tons each)</li>
<li>Packing and Truck Heading (4 Lines)</li>
<li>Fuel-Oil Storage and Treatment Plant</li>
<li>Water Storage &amp; Treatment Plant</li>
<li>Main Substation, Unit Substations and Electrical Rooms</li>
<li>Central Control and Management Building</li>
<li>Workshops and Stores</li>
<li>Raw Material and Product Truck Weighing Machines</li>
</ul>
<p>Concrete : 200,000 m3<br />
Steel Construction Manufacturing and Erection Works : 14,000 tons<br />
Mechanical Manufacturng Works : 11,000 tons<br />
Mechanical Erection Works : 21,000 tons</td>
</tr>
<tr>
<td><strong>Liquidated Damages</strong></td>
<td><strong>:</strong></td>
<td>None</td>
</tr>
</tbody>
</table>
]]></content:encoded>
					
					<wfw:commentRss>https://ekonas.com.tr/en/projects/cimko-narli-cement-plant-7500-t-d/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		
			</item>
		<item>
		<title>Bolu Cement Coal Homogenization Silo And Transport Line</title>
		<link>https://ekonas.com.tr/en/projects/bolu-cement-coal-homogenization-silo-and-transport-line/</link>
					<comments>https://ekonas.com.tr/en/projects/bolu-cement-coal-homogenization-silo-and-transport-line/#respond</comments>
		
		<dc:creator><![CDATA[Ekonas Site Yönetimi]]></dc:creator>
		<pubDate>Sun, 05 Jun 2022 21:03:58 +0000</pubDate>
				<guid isPermaLink="false">https://ekonas.com.tr/?post_type=portfolio&#038;p=1719</guid>

					<description><![CDATA[<p>The project has been performed on a turnkey basis.</p>]]></description>
										<content:encoded><![CDATA[<table style="width: 100%;">
<tbody>
<tr>
<td style="width: 30%;"><strong>Project</strong></td>
<td style="width: 2%;"><strong>:</strong></td>
<td>
<p class="normalYazi" style="margin-left: 28.5pt; text-indent: -28.5pt; tab-stops: 155.95pt;">10.000 Tons Closed Coal Homogenization Silo And Transport Line</p>
</td>
</tr>
<tr>
<td><strong>Client</strong></td>
<td><strong>:</strong></td>
<td>Bolu Cement Co.</td>
</tr>
<tr>
<td><strong>Consultant</strong></td>
<td><strong>:</strong></td>
<td>Oyak Construction Co.</td>
</tr>
<tr>
<td><strong>Contract Date</strong></td>
<td><strong>:</strong></td>
<td>11.05.2005</td>
</tr>
<tr>
<td><strong>Completion Date</strong></td>
<td><strong>:</strong></td>
<td>The project was completed on 31.12.2005.</td>
</tr>
<tr>
<td><strong>Duration</strong></td>
<td><strong>:</strong></td>
<td>18 Months</td>
</tr>
<tr>
<td><strong>Status</strong></td>
<td><strong>:</strong></td>
<td>Sub-Contractor</td>
</tr>
<tr>
<td><strong>Percentage Of Participation</strong></td>
<td><strong>:</strong></td>
<td>100 %</td>
</tr>
<tr>
<td><strong>General Description Of The Project</strong></td>
<td><strong>:</strong></td>
<td>The project has been performed on a turnkey basis.</td>
</tr>
<tr>
<td><strong>Detailed Description Of The Project</strong></td>
<td><strong>:</strong></td>
<td>Basic and detail engineering, manufacturing and erection works, equipment supply and erection, electrical and automation works and commissioning of the plant.</td>
</tr>
<tr>
<td><strong>Liquidated Damages</strong></td>
<td><strong>:</strong></td>
<td>None</td>
</tr>
<tr>
<td><strong>Main Subcontractors</strong></td>
<td><strong>:</strong></td>
<td>None</td>
</tr>
</tbody>
</table>
]]></content:encoded>
					
					<wfw:commentRss>https://ekonas.com.tr/en/projects/bolu-cement-coal-homogenization-silo-and-transport-line/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		
			</item>
		<item>
		<title>Aşkale Cement New Clinker Line (3500 T/D)</title>
		<link>https://ekonas.com.tr/en/projects/askale-cement-new-clinker-line-3500-t-d/</link>
					<comments>https://ekonas.com.tr/en/projects/askale-cement-new-clinker-line-3500-t-d/#respond</comments>
		
		<dc:creator><![CDATA[Ekonas Site Yönetimi]]></dc:creator>
		<pubDate>Sun, 05 Jun 2022 21:03:36 +0000</pubDate>
				<guid isPermaLink="false">https://ekonas.com.tr/?post_type=portfolio&#038;p=1717</guid>

					<description><![CDATA[<p>The project covers the construction of cement plant with 3500 tons/day clinker capacity.</p>]]></description>
										<content:encoded><![CDATA[<table style="width: 100%;">
<tbody>
<tr>
<td style="width: 30%;"><strong>Project</strong></td>
<td style="width: 2%;"><strong>:</strong></td>
<td>
<p class="normalYazi">Aşkale Cement Factory With Capacity 3500 ton on Bases Turn-Key Construction of New Klinker Line,Erzurum -Turkey</p>
</td>
</tr>
<tr>
<td><strong>Client</strong></td>
<td><strong>:</strong></td>
<td>Aşkale Cement Industry Inc.</td>
</tr>
<tr>
<td><strong>Contract Date</strong></td>
<td><strong>:</strong></td>
<td>02.02.2006</td>
</tr>
<tr>
<td><strong>Completion Date</strong></td>
<td><strong>:</strong></td>
<td>Clinker production started at 29.07.2007. Provisional Acceptance Certificate has been issued on 20.08.2007.</td>
</tr>
<tr>
<td><strong>Duration</strong></td>
<td><strong>:</strong></td>
<td>20 Months</td>
</tr>
<tr>
<td><strong>Status</strong></td>
<td><strong>:</strong></td>
<td>Main Contractor</td>
</tr>
<tr>
<td><strong>Percentage Of Participation</strong></td>
<td><strong>:</strong></td>
<td>100 %</td>
</tr>
<tr>
<td><strong>General Description Of The Project</strong></td>
<td><strong>:</strong></td>
<td>The project covers the construction of cement plant with 3500 tons/day clinker capacity.</td>
</tr>
<tr>
<td><strong>Detailed Description Of The Project</strong></td>
<td><strong>:</strong></td>
<td>The plant consists of :</p>
<ul>
<li>Farine homogination,</li>
<li>Precalcination,</li>
<li>Kiln,</li>
<li>Clinker cooler,</li>
<li>Electro filter,</li>
<li>Coal milland conveying units</li>
</ul>
</td>
</tr>
<tr>
<td><strong>Liquidated Damages</strong></td>
<td><strong>:</strong></td>
<td>None</td>
</tr>
<tr>
<td><strong>Main Subcontractors</strong></td>
<td><strong>:</strong></td>
<td>KHD HUMBOLT WEDAG, Germany<br />
GEBR PFEIFFER AG &#8211; Germany</td>
</tr>
</tbody>
</table>
]]></content:encoded>
					
					<wfw:commentRss>https://ekonas.com.tr/en/projects/askale-cement-new-clinker-line-3500-t-d/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		
			</item>
	</channel>
</rss>
